World class products and solutions. If you need a quick price, tender or specification review.


Lead Times & Delivery Guide – contact us for a specific day/time
Our Price Check Guarantee ensures value for money when buying this product
The Legrand TRIMOD HE 40kW modular UPS is rated at unity power factor where 40kW is equal to 40kVA of power and achieves up to 96% online operating efficiency. The UPS is a three phase (3/3) input and output system.
The TRIMOD HE is a true modular UPS system. The 40kW UPS frame can be installed with up to six 6.7kW modules (8.5Kg each) in a capacity or N+X configuration. Plug-in battery drawers can be installed in additional matching cabinet to provide from 8 minutes runtime and weigh only 13Kg each. An additional 15A battery charger module is available for larger battery configurations.
The UPS and batteries are supplied in matching cabinets with a height of 1370Hmm (cabinet type ‘A’). An additional cabinet is available for longer runtimes (type ‘B’) with a height of 1650mm and capacity for 20 plug-in battery drawers.
SKU | UPS Frame | Modules | Battery | 20KVA N+1 | UPS Dimensions | Battery Cabinet |
---|---|---|---|---|---|---|
Tri-HE-40-05 | 40kVA/kW | 6 x PM6.7K | 9AH-3S | 10minutes | 414Wx628Dx1370Hmm | 480Wx845Dx1670Hmm, 415Kg |
Tri-HE-40-09 | 40kVA/kW | 6 x PM6.7K | 40AH-1S | 20minutes | 414Wx628Dx1370Hmm | 480Wx845Dx1670Hmm, 460Kg |
Tri-HE-40-14 | 40kVA/kW | 6 x PM6.7K | 55AH-1S | 30minutes | 414Wx628Dx1370Hmm | 480Wx845Dx1670Hmm, 560Kg |
Tri-HE-40-25 | 40kVA/kW | 6 x PM6.7K | 56AH-1S | 50minutes | 414Wx628Dx1370Hmm | 782Wx845Dx1670Hmm, 770Kg |
Tri-HE-40-30 | 40kVA/kW | 6 x PM6.7K | 90AH-1S | 60minutes | 414Wx628Dx1370Hmm | 782Wx845Dx1670Hmm, 910Kg |
Tri-HE-40-45 | 40kVA/kW | 6 x PM6.7K | 105AH-1S | 90minutes | 414Wx628Dx1370Hmm | 840Wx900Dx1700Hmm, 1050Kg |
Tri-HE-40-60 | 40kVA/kW | 6 x PM6.7K | 115AH-1S | 120minutes | 414Wx628Dx1370Hmm | 990Wx900Dx2000Hmm, 1640Kg |
Contact our Projects team for advice and information or to book a site survey.
Call us Mon to Fri 8:30am to 18:00pm or after hours use our support hotline.
Who We Are
We have over 30 years of experience working within data centre and server room environments. Our knowledge and experience means that we know how to design, install and maintain the right cooling, energy management, power and monitoring solutions for any critical IT environment.
Project Management
Field based engineering locations: Chester, Warrington, London, Manchester, Bristol, Birmingham, Leeds, Belfast, Dublin and Glasgow for nationwide service coverage, site surveys, maintenance and emergency call outs.
Call us for a free survey.
Sales & Service 0800 030 6838
Manchester 0161 660 2388
London 0203 858 0608
Reading 0118 391 4338