
Lead Times & Delivery Guide – contact us for a specific day/time
Our Price Check Guarantee ensures value for money when buying this product
Earn SRE Reward Points when you buy this product.
1169 pointsThe CertaUPS 10kVA C500E series uninterruptible power supply from Server Room Environments with internal batteries for 7 minutes back-up runtime. The UPS is a high efficiency on-line single phase output system with a three phase or single phase input.
10kVA C500E UPS Features
10kVA UPS Applications
SKU | Description | UPS Dimensions | Extension Cabinet/Rack |
---|---|---|---|
C500E-100-B | 8 minutes internal | 350W x 650D x 890Hmm 127Kg | – |
C500E-100-24 | 24 minutes internal | 350W x 650D x 890Hmm 195Kg | – |
C500E-100-40 | 40 minutes | 350W x 650D x 890Hmm 195Kg | 260W x 550D x 710Hmm 105Kg |
C500E-100-55 | 55 minutes | 350W x 650D x 890Hmm 195Kg | 260W x 550D x 710Hmm 170Kg |
C500E-100-70 | 70 minutes | 350W x 650D x 890Hmm 195Kg | 480W x 845D x 1670Hmm 460Kg |
The CertaUPS C500E 10kVA UPS system has a 3-year warranty and internal battery and is a floor standing uninterruptible power supply.
Brand: | CertaUPS |
---|---|
Input Supply: |
110-276Vac (220/230/240Vac) or 190-478Vac (380/400/415Vac), 50/60Hz |
Output Supply: |
220/230/240Vac pure sinewave or 208Vac with 90% derating, 50/60Hz +/-10% |
Power Rating: |
10kVA/9kW |
Efficiency: |
94% on-line mode |
Runtime: |
7 minutes |
Connections: |
Terminal Block |
Dimensions: |
350Wx650Dx890Hmm |
Nett Weight: |
127Kg |
Warranty: |
36months |
Maintenance Contract: |
Battery replacement only or Emergency Response and Preventative Maintenance (Bronze, Silver, Gold or Platinum) |
Datasheet: | CertaUPS C500E UPS Systems |
---|
Contact our Projects team for advice and information or to book a site survey.
Call us Mon to Fri 8:30am to 18:00pm or after hours use our support hotline.
Who We Are
We have over 30 years of experience working within data centre and server room environments. Our knowledge and experience means that we know how to design, install and maintain the right cooling, energy management, power and monitoring solutions for any critical IT environment.
Project Management
Field based engineering locations: Chester, Warrington, London, Manchester, Bristol, Birmingham, Leeds, Dublin and Glasgow for nationwide service coverage, site surveys, maintenance visits and emergency call outs.
Call us for a free survey.
Sales & Service 0800 030 6838
Manchester 0161 660 2388
London 0203 858 0608
Reading 0118 391 4338